The project got kick-stated this week
The dry wall team covered the ceiling, the mirror and medicine
cabinet were installed and niche shelf in the entryway was installed.
|
|
Everything in the house was covered with dust from sanding the drywall
|
|
|
The rolling scafold in the living room
|
|
|
More of the scafold
|
|
|
|
The shelf for the entryway. It will be covered with marble
|
|
|
The toe kick for the powder room vanity
|
|
|
The ceiling covered with drywall
|
|
|
|
A little mistake. These things happen
|
|
|
The mirror and medicine cabinet have been installed
|
|
|